Investor Presentaiton slide image

Investor Presentaiton

Slide 13 Kina PETROLEUM LIMITED OVERSIZE PPL 337 - exploration drilling Raintree-1 At left is the small-bore rig used in PPL 337. Raintree-1 well drilled and Kwila-1 expected to spud before the end of June. Pioneering use of this non-heli supported technology has paved the way for lower cost and shorter duration drilling operations. Kina sees application elsewhere in its portfolio and throughout PNG.
View entire presentation