Investor Presentaiton
4.2 INDUSTRIAL PORT & DEDICATED JETTIES
ATTACHED TO THE SEABOARD ECONOMIC ZONE
LNG
(70ha)
Access Channel-
CTT
(150ha)
JICA Power Plant
Seaboard EZ
SPM
Camp
(78ha)
Iron & Steel
Steel Mill
Colony
(100ha)
Oil Refinery
(400ha)
MSL-11m
Water Depth
150m
Water Depth
MSL-5m
0600
0600
Turning Basin
Water Depth
MSL-m
0600
Water Depth
MSL-5m
50m
Ship
Breaking
Om
400m
800m
S=1/20,000
1200m - 1600m
Shipyard
Proposed Relocation
of SPM Pipe Lines
LEGEND
LI
Required Navigable Water Area for Seaboard EZ
Source:
11
1. Digital Mapping: JICA Study Team
2000m
2. Layout Plan of Each Sector: Southern Chittagong Region i.i
Development Survey Team (JICA)
Specifications of Industrial Port and
Navigation Channel
1. Design ship of call is Panamax size
which requires a maximum water depth
of MSL-11 m.
2. Navigation Channel from JICA Power
Plant to Seaboard EZ shall be dredged
to MSL-11m with 150m width.
3. Turning Basin in front of the EZ shall be
prepared with a diameter of 600m.
4. Water depth for ship recycling and
shipbuilding industries areas is MSL -5m.
19
Source: JICA Survey TeamView entire presentation