Investor Presentaiton slide image

Investor Presentaiton

For personal use only Aquila Resources DIXON ISLAND TRAIN UNLOADER LEVEL CROSSING AECOM BOUGUER PASSAGE TRAIN UNLOADER ACCESS ROAD FMG (50 Mipe TERMINAL 1 4 BERTH 2 SHIPLOADER HELIPORT PORT ADMIN AQIS FUEL STORAGE FUTURE DEVELOPMENT 80ha (50 Міра) WPIOP-STAGE 1 APPROACH JETTY TUG HARBOUR CONSTRUCTION DOCK ANKETELL POINT FUTURE DEVELOPMENT 19ha NO NAME BAY Anketell Port Anketell Point has been identified by the State as a suitable site for a new deep-water, bulk loading port for the West Pilbara area WPIOP has been in the process of completing extensive technical & environmental studies to develop an expandable facility, capable of growing to 350Mtpa capacity as required Port environmental assessment currently before the EPA, with the EPA report expected in Q2 CY2012 Port layout for the Stage 1 DFS has been updated: to comply with the Dampier Port Authority's Anketell Port Master Plan; and to avoid Dixon Island following concerns raised through the EIS process Latest discussions with the Government suggest an initial port layout design based on a 100Mtpa capacity port ANKETELL PORT DEVELOPMENT PLAN SINGLE CAUSEWAY OPTION - 100Mtpal A3-1:25000 SEPT 2011 SK-070 9
View entire presentation