Harvest Gold Investment Opportunity
05 THE PLAN
PROPOSED Exploration Plan
H
HARVEST GOLD
EMERSON
• Aerial magnetics survey (Fall 2020)
→ Twin historic AMAX holes with gold assays
(March 2021)
Ground-based pole-dipole IP survey (May 2021)
Drill Up to 20 holes over prospective
IP anomalies (Summer 2021)
JACOBITE
• Aerial magnetics survey (Fall 2020)
• IP survey with 200 m spacings in the vicinity of
the high Cu soil samples collected in 2019 soil
sampling at 100 m spacings on all new cut-lines
(May 2021)
Mapping, prospecting and sampling conducted
along the cut-lines
→ Maiden drill program if warranted
GOATHORN
→ IP survey at 400m intervals between bounding
faults and symmetrically around magnetic high
(May 2021)
→ Soil samples collected at 100 m intervals on the
cut-lines
Maiden drill program if warranted
20
20View entire presentation