Investor Presentaiton slide image

Investor Presentaiton

NHPC: Projects Under Construction NHPC Project Installed Capacity (MW) Design Energy (MU) Type of the project (Price Level) Subansiri Lower (250X8) 2000 7421 Reservoir 6285.33 (Dec02) 20368.90 CCEA Estimated Cost (Rs. Crore) An Anticipated Project Cost (Rs. Crore) Provisional - Project Expenditure till – Jun 20 (Rs. Crore) 12326.20 एनएचपीसी NHPC Expected Commissioning Schedule FY 23-24 (Q-2) Assam/ Ar. Pradesh (Jan'20) Parbati II (200x4) Himachal Pradesh 800 3108.66 Run of River with small pondage 3919.59 (Dec01) 9997.11 8260.31 FY 21-22 (Q-4) (Apr'19) Total (A) 2800 10529.66 Project Under Construction-Subsidiary S.No Projects 1 Installed Design Energy Cost (In Cr.) & PL Capacity (MW) (MUs) Lanco Teesta Hydro Power Limited (wholly owned subsidiary of NHPC Ltd.) i) Teesta VI (4x125) Sikkim 500 2400 5748 (July'18) 10204.92 30366.01 20586.51 Status Stat ■ CCEA in its meeting held on 07.03.2019 had given its approval for investment sanction for acquisition of M/s Lanco Teesta Power Limited and execution of balance works of the project. M/s LTHPL has been acquired by NHPC on 09.10.2019 & Board started functioning. Civil works awarded and tendering of all other works are in process. Mobilization of manpower and machinery affected due to COVID-19 Lockdown. However, required quarantine facilities have been developed by the project and contactor is being persuaded for early mobilization at site. TOTAL (B) 500 2400 5748
View entire presentation