Investor Presentaiton
NHPC: Projects Under Construction
NHPC Project
Installed
Capacity
(MW)
Design
Energy (MU)
Type of the
project
(Price Level)
Subansiri Lower (250X8)
2000
7421
Reservoir
6285.33 (Dec02)
20368.90
CCEA Estimated
Cost (Rs. Crore)
An
Anticipated
Project Cost (Rs.
Crore)
Provisional
-
Project
Expenditure till –
Jun 20 (Rs. Crore)
12326.20
एनएचपीसी
NHPC
Expected
Commissioning
Schedule
FY 23-24 (Q-2)
Assam/ Ar. Pradesh
(Jan'20)
Parbati II (200x4) Himachal
Pradesh
800
3108.66
Run of River
with small
pondage
3919.59 (Dec01)
9997.11
8260.31
FY 21-22 (Q-4)
(Apr'19)
Total (A)
2800
10529.66
Project Under Construction-Subsidiary
S.No
Projects
1
Installed Design Energy Cost (In Cr.) & PL
Capacity (MW)
(MUs)
Lanco Teesta Hydro Power Limited (wholly owned subsidiary of NHPC Ltd.)
i)
Teesta VI (4x125)
Sikkim
500
2400
5748
(July'18)
10204.92
30366.01
20586.51
Status
Stat
■ CCEA in its meeting held on 07.03.2019 had given its approval for investment
sanction for acquisition of M/s Lanco Teesta Power Limited and execution of
balance works of the project.
M/s LTHPL has been acquired by NHPC on 09.10.2019 & Board started
functioning.
Civil works awarded and tendering of all other works are in process.
Mobilization of manpower and machinery affected due to COVID-19
Lockdown. However, required quarantine facilities have been developed by
the project and contactor is being persuaded for early mobilization at site.
TOTAL (B)
500
2400
5748View entire presentation