HY 2023 Results and Growth Prospects slide image

HY 2023 Results and Growth Prospects

Oyu Tolgoi: Set to triple copper production Metrics 1,2 Ore processed For personal use only 2022 2023 - Unit Act 2027 2028 - 2036 LOMĀ³ Mt 39 40 42 40 Head grade (Cu) % 0.42 0.97 1.28 0.82 Recovery (Cu) % 80 87 90 84 Concentrate volume dmt 616 1,078 1,608 1,010 Concentrate grade (Cu) % 21 31 30 27 Copper production Gold production Kt 130 -340 ~500 ~290 Koz 184 -360 -330 -260 Construction of infrastructure to support ramp up to full production on track Gold remains a valuable by-product Producing high quality concentrate attractive to Chinese smelters Rio Tinto @2023, Rio Tinto, All Rights Reserved 1Based on the Oyu Tolgoi Feasibility Study 2020 (OTFS20) | 2See supporting references for the production targets underpinning these financial forecasts on slide 2 | 3LOM life of mine (2022-2051) 43
View entire presentation