Investor Presentaiton slide image

Investor Presentaiton

Overview of JCM Implementation STITUT THE TEKNO LOGIB BANDU DUNG 1920 Capital expenditure: 0 (provided by Consortium of Gundih CCS Research Project) Operating expenditure: USD$708,000/year (provided by Consortium for the first 2 years) ■Total project expenditure: USD$2,124,000 to reduce 38,315t-CO2 for 5 years in total USD$55/t-CO2 No. Cost Item Specification (1,000 USD/year) Roadmap A FIXED COST A.1 Iron Sponge Bed 143 14.206 kg absorbent/year A.2 Mole Sieve Bed Regeneration 2 1.126 LHFO/year 2018 • Pilot project under JCM The proposed project (10kt-CO2) A.3 Truck Driver Wage 7 4 person A.4 Truck Maintenance 35 5 trucks A.5 Truck Fuel 26 55 KL ADO/year A.6 Operator Wage 60 10 person 2022 • Demonstration project Gundih CCS project (300kt-CO2) B VARIABLE COST B.1 Electricity Cost 432 B.2 Heating Cost 6 B.3 Cooling Cost 1 Total 708 Large-scale CCS project 2027 35