Investor Presentaiton slide image

Investor Presentaiton

- OPERATING CASHFLOW – HY 2013 Spark Infrastructure HY 2013 HY 2012 % Change $m $m % 34.3 34.6 SA Power Networks - PPC distributions (0.7) 16.7 15.4 8.2 SA Power Networks - other distributions 40.3 40.4 Victoria Power Networks - sub debt interest (0.2) 91.3 90.4 1.1 Asset Company distributions 0.7 0.9 Interest received (19.9) Interest paid (2.5) (4.2) (40.8) Swap cancellation costs (2.2) n/m SDP bid costs (4.6) n/m General administrative expenses (4.0) (2.4) 68.2 83.3 80.1 4.1 Standalone OCF Standalone OCF per security 6.3cps 6.0cps 4.1 SPARK INFRASTRUCTURE INVESTOR PRESENTATION - NOVEMBER 2013 36 spark infrastructure
View entire presentation