Investor Presentaiton slide image

Investor Presentaiton

SOLAROZ LITHIUM BRINE PROJECT Table 2: Upgraded High-Grade Core within Total JORC Indicated and Inferred Mineral Resource Mineral Resource Category Lithology Units Sediment Volume Specific Yield % Brine volume LCE Lithium mg/l Lithium Tonnes million m3 Tonnes (million m³) A 878 10.0% 88 349 30,000 165,000 Indicated B 1,289 4.0% 52 357 18,000 100,000 Mineral C 3,288 5.6% 183 401 75,000 390,000 Resource D 4,881 4.8% 235 425 100,000 530,000 TOTAL 10,337 5.2% 557 400 223,000 1,185,000 B 92 4.0% 4 418 1,500 8,000 Inferred Mineral C D 436 5.7% 25 401 10,000 53,000 109 4.9% 5 405 2,000 12,000 Resource TOTAL 637 5.3% 34 403 13,500 73,000 TOTAL INDICATED & INFERRED MINERAL RESOURCE (HIGH-GRADE CORE) 5.2% 400 1,258,000 The high-grade core comprises JORC Indicated and Inferred Mineral Resources estimated within the mineralisation envelope of (not in addition to) the Mineral Resource Estimates outlined in Table 1. The Indicated Mineral Resource encompasses the Chico I, Chico V, Chico VI, Payo 2 South and Silvia Irene (Central Block) concessions The inferred Mineral Resource encompasses the southern Mario Angel (Units B and C) and Payo 1 and Payo 2 North (Northern Block) (Unit D) concessions, and is in addition to the Indicated Mineral Resource Estimate Reported at a 320 mg/l Lithium cut-off grade Refer Notes (c), (d) and (f) of Table 1 Notes: (a) (b) (c) (d) (e) EL LITHIUM ENERGY LTD ASX:LEL 20 20
View entire presentation