Endeavour Mining Investor Presentation Deck slide image

Endeavour Mining Investor Presentation Deck

PRODUCTION OUTLOOK Ability to grow high-quality production while maintaining AISC <$900/oz PRODUCTION AND ALL-IN SUSTAINING COSTS For discontinued operations For continuing operations¹ 2013A 2014A 2015A 2016A P 2017A 2018A 2019A 2020A 1.5Moz $885/oz 2021A 1.4-1.5Moz 1.3-1.4Moz <$900/oz $880-930/oz Gooooooooo 2022E Guidance 2023E ENDEAVOUR (1) Production stated on a 100% basis. Assumes first production from Sabodala-Massawa Expnasion in 2024, along with first production from Lafigué in 2024 and Karma ceasing production in 2022. MINING +1.5M <$900/oz 2024E Outlook +1.6Moz <$900/oz 2025E 19