Investor Presentaiton
Mexico's Gas Pipeline Network will expand considerably from 2012 to 2019
Total
expected
Mexicali
Los Algodones
2012
2016
3
Los Algodones bis
Sásabe
investment
4
Cd. Juárez
Nogales
Naco
Gloria a Dios
San Isidro
Agua Prieta
16
billion
dollars
6
2
Cd. Acuña
KM Monterrey
Reynosa
8
Ojinaga
Argüelles
Samalayuca 11
Piedras Negras
Río Bravo
Puerto Libertad
Colombia
12
El Encino
Sur de
Texas
Camargo
Guaymas
New transportation infrastructure by
2019, according to the Five Year
Gas Pipeline Plan:
•
•
10 new strategic gas pipelines
2 social coverage gas pipelines
7 interconnection points with
the US
1 interconnection with Central
America
El Oro
Topolobampo
143
La
Laguna
510
Dos Ramones
Escobedo 9
5
Durango
2019
Regasification Terminal
Operating Gas Pipeline
Concluded Gas Pipelines (2013/2014/2015)
Gas Pipelines under Construction (2015/2016)
Strategic Gas Pipelines included in the Five Year Plan
"El Cabrito" Compression Station, included in the Plan
Social Gas Pipelines, included in the Plan
Interconnections
Future Private Projects
Mérida
CRE
Pipelines*
1 Kinder Morgan (operating) KM
2 Gasoductos de Chihuahua (operating)
3
Sempra Energy
Transportadora de Gas Natural de Baja
California (operating) Sempra Energy
4 Gasoducto Rosarito (operating)
Sempra Energy
5 Gasoductos del Noreste (operating)
Sempra Energy
6 Gasoducto de Aguaprieta (operating)
Sempra Energy
7 Gasoductos de Tamaulipas (operating)
Sempra Energy
8 Gasoducto de Aguaprieta- Sonora
9
(operating) Sempra Energy
TAG Pipelines Norte (operating)
Sempra Energy/Pemex
10 Arguelles Pipeline (operating) Energy
Transfer Partner
11 Gasoducto de Aguaprieta -San Isidro-
(operating) Sempra Energy
12 Gasoducto de Aguaprieta -Ojinaga-
(operating) Sempra Energy
13 Midstream de México (operating)
Howard Midstream Energy Partners
Mazatláno
Zacatecas
Aguascalientes
San
Luis
Potosí
N. Reyes
Altamira
4
of operations: second semester 2016)
Tuxpan - Tula and Tula - Villa de Reyes (expected start of
1
2
Pipelines*
Manzanillo - Guadalajara (operating)
Naranjos Tamazunchale - El Sauz (operating)
3 El Encino - Topolobampo and El Oro - Mazatlán (expected start
Guadalajara
Tamazunchale
Naranjos
Tuxpan
Tula
Apaseo el Alto
ativitas
4
Huexca
Cempoala
Cancún
ㅁ
Lázaro Cárdenas
Ciudad
Pemex
Jáltipan
5 operations: first semester 2018) permit process.
South Texas - Tuxpan. permit process.
*Participation of American and Canadian capital in Mexico's Gas Pipeline Network
Source: Five Year Gas Pipeline Plan 2015-2109, http://www.gob.mx/sener/acciones-y-programas/plan-quinquenal-de-gas-natural-2015-2019
Nuevo
☐
Acapulco
Pemex
Salina
Cruz
Centroamérica
Tapachula
☐
16View entire presentation