Investor Presentaiton slide image

Investor Presentaiton

Mexico's Gas Pipeline Network will expand considerably from 2012 to 2019 Total expected Mexicali Los Algodones 2012 2016 3 Los Algodones bis Sásabe investment 4 Cd. Juárez Nogales Naco Gloria a Dios San Isidro Agua Prieta 16 billion dollars 6 2 Cd. Acuña KM Monterrey Reynosa 8 Ojinaga Argüelles Samalayuca 11 Piedras Negras Río Bravo Puerto Libertad Colombia 12 El Encino Sur de Texas Camargo Guaymas New transportation infrastructure by 2019, according to the Five Year Gas Pipeline Plan: • • 10 new strategic gas pipelines 2 social coverage gas pipelines 7 interconnection points with the US 1 interconnection with Central America El Oro Topolobampo 143 La Laguna 510 Dos Ramones Escobedo 9 5 Durango 2019 Regasification Terminal Operating Gas Pipeline Concluded Gas Pipelines (2013/2014/2015) Gas Pipelines under Construction (2015/2016) Strategic Gas Pipelines included in the Five Year Plan "El Cabrito" Compression Station, included in the Plan Social Gas Pipelines, included in the Plan Interconnections Future Private Projects Mérida CRE Pipelines* 1 Kinder Morgan (operating) KM 2 Gasoductos de Chihuahua (operating) 3 Sempra Energy Transportadora de Gas Natural de Baja California (operating) Sempra Energy 4 Gasoducto Rosarito (operating) Sempra Energy 5 Gasoductos del Noreste (operating) Sempra Energy 6 Gasoducto de Aguaprieta (operating) Sempra Energy 7 Gasoductos de Tamaulipas (operating) Sempra Energy 8 Gasoducto de Aguaprieta- Sonora 9 (operating) Sempra Energy TAG Pipelines Norte (operating) Sempra Energy/Pemex 10 Arguelles Pipeline (operating) Energy Transfer Partner 11 Gasoducto de Aguaprieta -San Isidro- (operating) Sempra Energy 12 Gasoducto de Aguaprieta -Ojinaga- (operating) Sempra Energy 13 Midstream de México (operating) Howard Midstream Energy Partners Mazatláno Zacatecas Aguascalientes San Luis Potosí N. Reyes Altamira 4 of operations: second semester 2016) Tuxpan - Tula and Tula - Villa de Reyes (expected start of 1 2 Pipelines* Manzanillo - Guadalajara (operating) Naranjos Tamazunchale - El Sauz (operating) 3 El Encino - Topolobampo and El Oro - Mazatlán (expected start Guadalajara Tamazunchale Naranjos Tuxpan Tula Apaseo el Alto ativitas 4 Huexca Cempoala Cancún ㅁ Lázaro Cárdenas Ciudad Pemex Jáltipan 5 operations: first semester 2018) permit process. South Texas - Tuxpan. permit process. *Participation of American and Canadian capital in Mexico's Gas Pipeline Network Source: Five Year Gas Pipeline Plan 2015-2109, http://www.gob.mx/sener/acciones-y-programas/plan-quinquenal-de-gas-natural-2015-2019 Nuevo ☐ Acapulco Pemex Salina Cruz Centroamérica Tapachula ☐ 16
View entire presentation