Etalon Group Operating Results
NEW PROJECTS ACQUIRED IN MMA(1) IN 2016
PROJECT IN THE PEROVO
DISTRICT
PROJECT IN THE
NIZHEGORODSKIY DISTRICT
PROJECT IN THE
MYTISHCHINSKIY DISTRICT
Total NSA: 173 ths sqm
Total NSA: 86 ths sqm
Total NSA: 60 ths sqm
Construction to start in 2018
Construction to start in 2018
Construction to start in 2017
PROJECT NEAR RYAZANSKIY
PROSPEKT
Total NSA: 185 ths sqm
Construction to start in 2018
The new project will include 105 ths sqm
of residential area, 1,500 parking
places, a pre-school, and a school.
The land plot is located in an area with
well-developed infrastructure, and is
approximately 1 km from Izmaylovsky
park. The project will have good
transport accessibility: central Moscow
can be reached in 20 minutes by car or
by metro from the nearest station,
Shosse Entuziastov, which is within just
10 minutes' walk.
The project will include 53 ths sqm of
residential area, 864 parking places and
a pre-school.
It is located in the Nizhegorodskiy region
of the South-Eastern administrative
district of Moscow. The project will have
good transport accessibility: central
Moscow can be reached in 15 minutes by
car, and the nearest metro station,
Novokhokhlovskaya, is within just 10
minutes' walk.
The new comfort-class residential
project is located in the Mytishchinsky
district of the Moscow region, six
kilometres from the Moscow Ring Road.
The project will include four low-rise
buildings up to three stories high,
containing 780 flats, a detached
parking garage, a pre-school and a
primary school for 105 and 215
students, respectively.
The project will include 113 ths sqm of
residential area, 1,700 parking places, a
school, and two pre-schools.
It is located 10-15 minutes' walking
distance from the Nizhegorodskaya
metro station, with schools, pre-
schools, stores and several shopping
malls in close proximity. Central
Moscow is a 20-minute car ride from the
development.
(1) Moscow, New Moscow and Moscow region within 30 km from Moscow Ring Road
Etalon Group
OPERATING
RESULTS
LANDBANK
VALUATION
FINANCIAL
RESULTS
SELECTED
PROJECTS
APPENDIX
14View entire presentation