Golden Zone Project Investment Overview slide image

Golden Zone Project Investment Overview

Nevada | Jungo Property - Permitted, Bonded & Drill Ready ✡AVIDIAN - Project Ownership Claims / Size Target Jungo - Humboldt County 100% 235 claims (1,960 ha) + 5 km long gold-copper system with mineralization in a magmatic-hydrothermal environment between the Hycroft (~15.3 Moz M&I AuEq) and Sleeper (~3.1 Moz M&I Au) deposits Intrusion related gold system with structurally controlled Au-Cu mineralization along NNE Jungo Reno Humboldt Trend Getchill Trend trending structures 4.3 m @ 1.67 g/t Au & 2.74 % Cu 1.5 m @2.49 g/t Au & 0.67 % Cu Previous Drilling 12.2 m @ 1.29 g/t Au 1.5 m @ 1.49 g/t Au & 0.27% Cu & 2.22 % Cu Past & Present Au Producers TSX-V: AVG & OTC: AVGDF -------- Battle Mt - Eureka Trend Walker Lane Trend Permitted, Bonded & Drill Ready Carlin Trend: +100 Moz Battle Mt/Eureka Trend: +50 Moz Walker Lane Trend: 50 Moz 100 KM 100 Miles Independe Trend Elko Carlin Trend Las Vegas geology.com 5
View entire presentation