Investor Presentaiton slide image

Investor Presentaiton

一期一会| ICHIGO FY24/6 H1 Power Suspensions Installing Online Grid Control Systems to Limit Lost Power Generation During Power Suspensions - Installed in 4 (6 plants) out of 7 regions (15 plants) - - Contributing to the reduction in power generation loss despite increased number of power suspensions Scheduled to install online grid control systems in Okinawa & Hokkaido Power FY24/6 Utility Co. 2023/07 2023/08 2023/09 2023/10 2023/11 2023/12 Total FY23/6 (Actual) Ichigo Kiryu Okuzawa TEPCO Ichigo Motomombetsu Hokkaido Ichigo Muroran Hatchodaira Hokkaido Ichigo Engaru Kiyokawa Hokkaido Ichigo Iyo Nakayamacho Izubuchi¹ Shikoku 1 (1) Ichigo Nakashibetsu Midorigaoka Hokkaido Ichigo Abira Toasa Hokkaido Ichigo Toyokoro Hokkaido Ichigo Nago Futami Okinawa Ichigo Engaru Higashimachi Hokkaido Ichigo Takamatsu Kokubunjicho Nii¹ Shikoku Ichigo Miyakonojo Yasuhisacho¹ Kyushu Ichigo Toyokawa Mitocho Sawakihama Chubu 1 1 1 3 1 (1) 1 1 1 2 2 4 Ichigo Yamaguchi Aionishi¹ Ichigo Yamauchi Sayama¹ 1 |Chugoku |Chugoku 1 1 1 1 (1) 1 (1) 1 2 (1) 1 (1) 2 1 Power plants equipped with online grid control systems are suspended on an hourly basis at the request of regional electricity companies. Proxy power suspension is conducted by an online power suspension company in place of an offline company and is later reimbursed. (Number of proxy power suspension days in parentheses) 3 Includes days when power suspensions and proxy power suspensions are conducted on the same day Ichigo Investment Advisors Co., Ltd. Ichigo Green Infrastructure Investment Corporation All rights reserved. 13
View entire presentation