Investor Presentaiton
一期一会|
ICHIGO
FY24/6 H1 Power Suspensions
Installing Online Grid Control Systems to Limit Lost Power Generation During
Power Suspensions
-
Installed in 4 (6 plants) out of 7 regions (15 plants)
-
-
Contributing to the reduction in power generation loss despite increased number of
power suspensions
Scheduled to install online grid control systems in Okinawa & Hokkaido
Power
FY24/6
Utility Co. 2023/07
2023/08 2023/09
2023/10 2023/11 2023/12
Total
FY23/6
(Actual)
Ichigo Kiryu Okuzawa
TEPCO
Ichigo Motomombetsu
Hokkaido
Ichigo Muroran Hatchodaira
Hokkaido
Ichigo Engaru Kiyokawa
Hokkaido
Ichigo Iyo Nakayamacho Izubuchi¹
Shikoku
1 (1)
Ichigo Nakashibetsu Midorigaoka
Hokkaido
Ichigo Abira Toasa
Hokkaido
Ichigo Toyokoro
Hokkaido
Ichigo Nago Futami
Okinawa
Ichigo Engaru Higashimachi
Hokkaido
Ichigo Takamatsu Kokubunjicho Nii¹
Shikoku
Ichigo Miyakonojo Yasuhisacho¹
Kyushu
Ichigo Toyokawa Mitocho Sawakihama Chubu
1
1
1
3
1 (1)
1
1
1
2
2
4
Ichigo Yamaguchi Aionishi¹
Ichigo Yamauchi Sayama¹
1
|Chugoku
|Chugoku
1
1
1
1 (1)
1 (1)
1
2 (1)
1 (1)
2
1 Power plants equipped with online grid control systems are suspended on an hourly basis at the request of regional electricity companies.
Proxy power suspension is conducted by an online power suspension company in place of an offline company and is later reimbursed.
(Number of proxy power suspension days in parentheses)
3 Includes days when power suspensions and proxy power suspensions are conducted on the same day
Ichigo Investment Advisors Co., Ltd. Ichigo Green Infrastructure Investment Corporation All rights reserved.
13View entire presentation