Japan Gold Corp. Corporate Presentation March 2024 slide image

Japan Gold Corp. Corporate Presentation March 2024

JAPAN GOLD ADVANCING PROJECTS Ikutahara 21,332 ha Ikutahara Project - Multiple Prospects • • • Kitano-o to Showa CSAMT grid extension completed strong coincident resistivity features identified coincident with broad high-grade gold in soil anomalies Saroma-Jomon Corridor prospects - defined by Au and pathfinder in soil anomalies along 9 km long structural corridor, additional prospect scale geophysics required to refine further drill targets Ryuo prospect 3D model was revised and new target zones were identified, Bajo 4,478 ha Sanru 41,584 ha Hokkaido Buho 2,770 ha Kyushu Ohra-Takamine 3,705 ha 00 Honshu Sumitomo Metal Mining Co. Ltd. Hishikari Mine 9 Japan Gold Corp. | Corporate Presentation | March 2024 • Targets identified by the soil grid ground identifying zones of strong silicification • Soil grid required further expansion to fully define anomaly limits Sanru Project • Significant high-grade vein widths proven in historical workings Buho Project • • Historical data compilation and preparation of the LeapFrog model initiated Soil grids completed over the Buho historical workings to confirm the extent of alteration and post-mineral cover with assays pending Ground-checked historical drill locations re-assessing the vein orientations of the high- grade vein intercept drilled Bajo Project • Additional detailed mapping & rock sampling completed • Potential structural repetitions of the ultra-high-grade veins historically mined at the Bajo mine identified on the west side of the project Ohra-Takamine Project • Single drill hole completed; based on results, a full geological model reconstruction and re-interpretation completed resulting in the definition of several new targets Large portfolio of additional prospective projects in the pipeline JAPAN GOLD CORP.
View entire presentation