Japan Gold Corp. Corporate Presentation March 2024
JAPAN GOLD ADVANCING PROJECTS
Ikutahara
21,332 ha
Ikutahara Project - Multiple Prospects
•
•
•
Kitano-o to Showa CSAMT grid extension completed strong coincident resistivity features
identified coincident with broad high-grade gold in soil anomalies
Saroma-Jomon Corridor prospects - defined by Au and pathfinder in soil anomalies along
9 km long structural corridor, additional prospect scale geophysics required to refine
further drill targets
Ryuo prospect 3D model was revised and new target zones were identified,
Bajo
4,478 ha
Sanru
41,584 ha
Hokkaido
Buho
2,770 ha
Kyushu
Ohra-Takamine
3,705 ha
00
Honshu
Sumitomo Metal Mining Co. Ltd.
Hishikari Mine
9 Japan Gold Corp. | Corporate Presentation | March 2024
•
Targets identified by the soil grid ground identifying zones of strong silicification
•
Soil grid required further expansion to fully define anomaly limits
Sanru Project
•
Significant high-grade vein widths proven in historical workings
Buho Project
•
•
Historical data compilation and preparation of the LeapFrog model initiated
Soil grids completed over the Buho historical workings to confirm the extent of alteration
and post-mineral cover with assays pending
Ground-checked historical drill locations re-assessing the vein orientations of the high-
grade vein intercept drilled
Bajo Project
•
Additional detailed mapping & rock sampling completed
•
Potential structural repetitions of the ultra-high-grade veins historically mined at the Bajo
mine identified on the west side of the project
Ohra-Takamine Project
•
Single drill hole completed; based on results, a full geological model reconstruction and
re-interpretation completed resulting in the definition of several new targets
Large portfolio of additional prospective projects in the pipeline