Investor Presentaiton
CORPORATE STRATEGY
STRATEGY
Improving Service & Capacity
•
Maximizing Potential Asset
•
TARGET
•
Become a coal port that can ship a minimum 25 million
ton per year
•
Developing unloading station with a minimum capacity
17 million ton per year
Build upstream coal loading station close to coal mining
site to boost the amount of coal loaded.
• Developing supporting service business for coal industry
such as (hauling, mining contractor and other
supporting services)
• Acquire and integrate business groups in the energy
sector
• Improve operational efficiency
•
• Develop integrated business activities
Maintaining and improving the quality of the products
and services provided, corporate governance, health and
safety standards, and social responsibility
Build the company's long-term sustainable production
profile
•
•
.
PROGRESS
The coal mine owned by PT Truba Bara Banyu Enim's subsidiary
in Gunung Megang, Muara Enim began operating and trading in
February 2022. This coal mine is projected to increase coal sales
by ~20% (completed)
RMK Energy has completed the construction phase of the
Gunung Megang loading facility in Muara Enim Regency, which is
equipped with a Train Loading System (TLS). This loading station
is projected to load 2 million ton coal (completed)
In June 2022 Container Yard (CY) 3B has been officially operated
The addition of coal unloading capacity aims to accommodate
the increase in the volume of coal transportation from coal
loading stations in Lahat and Muara Enim (completed)
Roads construction in potential mining area to provide hauling
services to the Gunung Megang loading station (on progress)
Kramasan Port is the only private port in indonesia that is
connected by train. This is able to provide a competitive
advantage in terms of travel time and transportation cost
efficiency (completed)
• The Company is currently developing an underground conveyor
in the CY area for the bottom dump process which will use a
hopper wagon for coal unloading which leads to more coal
unloading capacity (on progress)
13View entire presentation