Investor Presentaiton slide image

Investor Presentaiton

Galilee Basin - potential four well campaign Ensign 932 rig to arrive early/mid April - Fit for purpose rig with increased horsepower Drilling pad build commenced Targeting the large 61 km² conventional Albany gas structure - - Successful gas flow at Albany-1 of 230,000 scfd Only 13 metres of target zone intersected. (approximately 10%) Albany-1/ST1 to drill all of original target zone Substantial coring program planned • Albany-2 to appraise the scale of the Albany Field • Fracture stimulation of both wells Option for a further two wells Albany-1 gas flow with no fracture stimulation; target zones to be tested completely as part of new well campaign 932 Successful gas flows at Albany-1 to be further appraised VINTAGE ENERGY 9
View entire presentation