INVESTMENT PROGRAM K Investment program (1) in 2011 composed USD 88 mln. net of VAT. The largest investment items included: Acquisition of large mining and transport equipment A The construction of the second enrichment plant with 4 mln. tonnes annual capacity The completion of construction fuel and lubricants dump In 2012-2016 there will be 4 major investment categories: Development of Bryanskiy open-pit mine to start coal production in 2015 Construction of 3 new coal processing and enrichment facilities to improve coal quality and raise production efficiency Continued procurement of mining equipment to increase production at the existing open-pit mines Equipment procurement plan CAPEX 2011 Dec 31, 2011 CAPEX 2012-2016 Shovels 2 22 15 (3 P&H) (P&H, Komatsu, EO) 22 88 64 Trucks (BelAZ) Dozers (Komatsu) 9 20 9 Loaders (Komatsu) 2 34 3 Graders (Komatsu, 1 4 2 CAT) CAPEX forecast breakdown, 2012-2016(2) 7% 4% Drill Rigs (Ingersoll Rand) 1 4 3 4% 7% 200 USD mln. 160 USD 521 128 122 2 30 mln. 47 8 7 3 37 % 5 2% % 100 10 72 11 3 29 37 7 5 10 6 39 A 99 62 16 2 2 3 1 56 28 32 0 2012 2013 2014 2015 2016 | Processing and enrichment plants Equipment Other infrastructure ■Bryanskiy coal deposit Enrichment facilities launching schedule: Enrichment plant #2 (KNS and Dense-medium technology) with 4 mln. tonnes annual capacity planned to be launched in Q4 2012 Enrichment plant #3 (Oxidized coal) planned to be launched in 2013 Enrichment plant #4 (Dense-medium technology) with 7-8 mln. tonnes annual capacity planned to be launched in 2015. Other Retail network infrastructure Railway infrastructure (1) - Figures were converted to USD using the average exchange rate of the Central Bank of the Russian Federation (2011: 29.39 RUB/USD) (2)- Net of VAT, USD figures were converted from RUB using 30.00 RUB/USD exchange rate 7/22
View entire presentation