Perspectives on South Korean Overseas Investments

Direct Infrastructure Transactions Example 1 - Power Plant Construction Mezzanine Loan Location: Northeast U.S. Capacity: 1,100MW Plant Fuel: Natural Gas Plant Efficiency: 6,630 Btu/kWh Total Amount: Role: ā˜‘ DARC MATTER $1.58bn (Senior $700mm / Mezz $175mm / Equity $703mm) Underwrote entire mezzanine tranche ~$175mm and a minority portion of equity Location: Example 2 - Power Plant Refinancing Northeast U.S. Capacity: 694MW Plant Fuel: Natural Gas Plant Efficiency: 6,617 Btu/kWh Total Refinancing: Role: $675mm Senior Secured Term Loan B, 7- year Tenor Arranged an investment of $175mm in the senior secured term loan B 16