DONLIN GOLD: 2021 Drill Program Update
The Donlin Gold 2021 drill program is progressing as planned
The Donlin Gold project camp was safely re-opened in
March 2021 with four drills operating
A total of 28 holes have been drilled as of June 29, 2021
(approx. 8,650 meters of length drilled) out of 64 planned
for the 2021 program – representing over 40% of the
20,100 meters of planned drilling
-
The program is expected to:
Validate mineralization continuity, and test for extensions
of high-grade zones in both intrusive (igneous) and
sedimentary rocks
Provide necessary information to support a decision to
move to the upcoming feasibility study, subject to a formal
decision by the Donlin Gold LLC Board, and initiate the
engineering work necessary to advance the project design
before reaching a construction decision
6880000N
6879000N
6878000N
1952-
1955 -
1974
1960 1963A 1965
1957 1953
ACMA Pit
540000E
1976
1970
1969
© 1981
1978-
541000E
1982
1971
1973
1968
1966
1975
1962
• 1961
1956B
● 1954
1979
● 1980
1959
1972
1977-
1983
1958
1967A
1964
542000E
Lewis Pit
2021 Drill Program
drilled or in progress
planned holes
*Pit outline is mineral reserve pit outline from
the 2011 Technical Report as defined below.
NOVAGOLD
6
543000EView entire presentation