Investor Presentaiton slide image

Investor Presentaiton

Key Project Benefits . At the end of the 20 year contract, AHP will be transferred to GPL at zero cost. If properly maintained, AHP should have a lifespan of 100+ years Increase in the quality and reliability of electricity delivered to GPL customers through the use of new world class equipment - The 230 kV double circuit transmission system will create a new backbone for the electrical system for reliable and higher quality power Improved reliability will incentivize self-generators to switch to the GPL grid, reducing both their costs and emissions Transform Guyana's electricity sector from almost fully oil dependent to one built on renewable, clean energy - Greenhouse gas emissions from electricity generation will be reduced by nearly 90% AHP is the least cost option to satisfy GPL's base load electricity requirements Other alternatives are either more costly (thermal), not suitable for base load (wind power) and/or insufficient to meet Guyana's needs (biomass) AHP is optimally sized based on demand projections This will allow self-generators in Georgetown and Linden to come onto the grid, creating one interconnected grid 6 SITHE GLOBAL
View entire presentation