Investor Presentaiton
Mineral Resource Estimate
Mineral Resource Estimate. Reported at cut-off of 1% Pb (Pb domains only).
Pacifico
Minerals Ltd
.
Updated Mineral Resource
Measured
Indicated
Inferred
Total
Estimate undertaken by
Deposit Mt
independent consultants CSA
Pb Ag Zn
(%) (g/t)
Pb
Ag
Zn
Pb
Ag
Zn
Pb
Ag
Zn
Mt
Mt
Mt
(%)
(%)
(g/t)
(%)
(%)
(g/t)
(%)
(%)
(g/t)
(%)
A
0.6
6.1
32
1.2
0.6
6.1
32
1.2
Global Pty Ltd and reported to
the ASX in June 2020.
B
0.5
4.3
24
0.3
1.3
4.2
Omega
4.2
4.3
45
0.4
9.2
3.2
22
24
29
འཐ
0.3
1.8
4.3
24
0.3
0.4
2.5
3.0
23
0.6
15.8
3.5
32
0.4
.
Demonstrates the potential to
incorporate more high-grade
material into the Sorby Hills
Mine Plan.
Norton
2.4
4.3 83
0.3
2.2
3.4
38
0.5
16.0
2.5
30
0.4
20.6
2.8
37
0.4
Alpha
Beta
1.0
2.8
50
0.6
1.0
3.4
85
1.4
2.0
3.1
67
1.0
3.3
4.6
61
0.4
3.3
4.6
61
0.4
Total
7.1
4.3
57
0.4
13.7
3.3
31
0.4
23.4
3.00
36
0.5
44.1
3.3
38
0.5
The information presented above is extracted from the report entitled "Mineral Resource Update Sorby Hills Pb-Ag-Zn Project" released on 2 June 2020 and is available to view on www.pacificominerals.com.au/.
•
Contained Lead Metal and Resource Tonnage versus Cut-Off grade (Measured & Indicated Only).
Contained Lead within the
Measured and Indicated portion
of the Resource is only
marginally susceptible to a
change in cut-off grade.
The result demonstrates the
impressive robustness of the
Sorby Hills Resource.
Resource Tonnes
25,000,000
20,000,000
15,000,000
10,000,000
0
TONNES
Pb Tonnes
0.5
0
1
1.5
2
2.5
3
Cut-off Pb %
Pacifico Minerals Limited ASX:PMY
800,000
600,000
400,000
200,000
Contained Lead Metal
27View entire presentation