Continuous enhancement of joint dispatching capability of cascade stations The cascade stations in the upper reaches of the Yangtze River implement the joint dispatching to continuously improve the utilization efficiency of water resources 975 1000 825 800 Wudongde 600 400 200 0 600 Baihetan Design water level (m) Three Gorges 175 Gezhouba 66.5 'Accurate scheduling" promotes water conservation, generation increase and efficient utilization Accumulated flood detention and storage of 380 Xiluodu Xiangjiaba Geheyan Shuibuya Gaobazhou Qingjiang River $ Water conservation and generation increase of hydropower stations under joint dispatching since 2010 (100 GWh) 120 100 228822 80 60 43 33 40 50 76 55 Xiluodu and Xiangjiaba Hydropower Stations were put into operation, and joint dispatching of four reservoirs started 96 99 96 91 92 92 The first batch of units of Wudongde Hydropower Station was put into operation, and joint dispatching of five reservoirs started 99 99 cascade reservoirs 36 billion m³ Proportion to the total flood detention of reservoirs in the middle and upper reaches of the Yangtze River 60% 24-hour hydrological forecast accuracy of cascade reservoirs 98% Improvement of hydropower utilization of cascade stations 4.54% The joint dispatching of the five reservoirs successfully responded to the A third largest basin-wide flood in the Yangtze River since the founding of PRC, and withstood the test of the biggest flood peak since the establishment of the reservoirs Three Gorges Reservoir 75,000 m³/s Xiluodu Reservoir 18,200 m³/s 0+ 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 长江电力 China Yangtze Power Co., Ltd. Source: periodic reports and other publicly disclosed information of the Company 15
View entire presentation