Australia Coal and Laos Power: Operational and Financial Summary
Shanxi Lu Guang update
2013
2014
2015
Project approval
Finance
JV
formed
2016
Final
approval
by Shanxi
2017
Provincial
DRC*
Power plant
Equity
222
30%
70%
Debt
Preliminary
approval
by Shanxi
Provincial
DRC*
Banpu's
contribution c.US$ 74 M
Other
approvals:
water, land
and EIA
*Development and Reform Commission
Equity
drawdown
Design and
procurement
Debt
drawdown
DDDD
Weather
monitoring
for air
cooling
Construction
and
commissioning
COD
1st unit
COD
2nd unit
Comments
■ Obtained final approval from
Shanxi Provincial DRC in
November 2015
☐
BANPU
Project is applying for grid
interconnection approval** and
construction permit
Equity injection of RMB 112.5 m by
Banpu in 2015 from total Banpu's
contribution c. RMB 450 m.
Shortlisted of 6 Banks to provide
project finance to the project.
■ Preliminary design was completed
in October 2015
Bidding for main equipment is
completed. Continue with bidding
for plant auxiliaries and other
equipment.
Preparation for construction of
foundation for cooling tower,
chimney and main work shop
underway
** The interconnection approval is NOT the pre-condition for Shanxi Luguang to get the final project approval from Shanxi Provincial DRC
39
DISCLAIMER The views, information and indications expressed here including forward looking targets and indications are illustrative only, are subject to change, may be based on incorrect assumptions, and have not
been independently verified. No representation or warranty is made as to the accuracy, completeness or reliability of the views, information as indications expressed here. This slide should not be relied upon as a
recommendation or forecast by Banpu Public Company Limited. Nothing in this slide should be construed as either an offer to sell or a solicitation of an offer to buy or sell shares in any jurisdiction.View entire presentation