Australia Coal and Laos Power: Operational and Financial Summary slide image

Australia Coal and Laos Power: Operational and Financial Summary

Shanxi Lu Guang update 2013 2014 2015 Project approval Finance JV formed 2016 Final approval by Shanxi 2017 Provincial DRC* Power plant Equity 222 30% 70% Debt Preliminary approval by Shanxi Provincial DRC* Banpu's contribution c.US$ 74 M Other approvals: water, land and EIA *Development and Reform Commission Equity drawdown Design and procurement Debt drawdown DDDD Weather monitoring for air cooling Construction and commissioning COD 1st unit COD 2nd unit Comments ■ Obtained final approval from Shanxi Provincial DRC in November 2015 ☐ BANPU Project is applying for grid interconnection approval** and construction permit Equity injection of RMB 112.5 m by Banpu in 2015 from total Banpu's contribution c. RMB 450 m. Shortlisted of 6 Banks to provide project finance to the project. ■ Preliminary design was completed in October 2015 Bidding for main equipment is completed. Continue with bidding for plant auxiliaries and other equipment. Preparation for construction of foundation for cooling tower, chimney and main work shop underway ** The interconnection approval is NOT the pre-condition for Shanxi Luguang to get the final project approval from Shanxi Provincial DRC 39 DISCLAIMER The views, information and indications expressed here including forward looking targets and indications are illustrative only, are subject to change, may be based on incorrect assumptions, and have not been independently verified. No representation or warranty is made as to the accuracy, completeness or reliability of the views, information as indications expressed here. This slide should not be relied upon as a recommendation or forecast by Banpu Public Company Limited. Nothing in this slide should be construed as either an offer to sell or a solicitation of an offer to buy or sell shares in any jurisdiction.
View entire presentation