MINE INFRASTRUCTURE LAYOUT Lake 18 Take #19 Lake F16 Waste and dry tailing stockpile" Phase 2 Equalization pond Final effluent water treatment plant Blasting Lake 94 (2305 Explosives storage ake $15 cap storage 3250x Waste and dry tailing stockpile Phase 1 Phade dance (500m) Lake 12 Rose-Tantalum Pitx 317 Fit electrical substation Ore stockpile □ Industrial pad Main access road GOODY Main sub station KITO Take 43 Overburden stockpile 3330 Lake Lake Lake es Proposed Hydro-Québec line bypass (A)) Lake #10 Borrow pit (148 000 m³) $490) COLLE Eastmain Reservoir Hydro-Québec exclusion area Eastman-1 road To Nemaska (42 km) CriticalElements Lithium Corporation TSX-V:CRE 33 33