STALLION RARE EARTHS (REE) PROJECT
PHASE 2 DRILLING
Building on Phase 1 Results
I
514,000 ME
515,000 ME
516,000 ME
•
Best intercepts from the Phase 2 Drilling include:
•
STR023: 9m at 1664.12 ppm TREO from 58m
·
STRC017: 34m at 1021.8 ppm TREO from 37m
STRC019: 31m at 1298.37 ppm TREO from 63m
Future Work
•
·
Maiden Mineral Resource Estimate expected for
Stallion upon receiving the balance of the results
• Planning underway for another extension and
•
infill drilling phase to be conducted
AMSUL (pH ~ 4) leach unsuccessful, moving to
stronger digestions (H2SO4, HCI)
- 6,659,000 MN
E 28/3241
Map
Area
E 28/2999
STRC020 from 29m
7m at 832ppm TREO
-6,658,000 mN
STRCO17-from 37m
34m at 1022ppm TREO
STRC016 from 30m
12m at 1292ppm TREO
STRC015 from 20m
14m at 610ppm TREO
-6,657,000 MN
STRC026 From 27m
14m at 954ppm TREO
STRC021
from 48m
3m at 547ppm TREO
Abandoned
STRC027 From 48m
2m at 692ppm TREO
STRC028 From 39m
5m at 1362ppm TREO
514,000 mE
515,000 ME
I
STRC019
from 54m
3m at 635ppm TREO
and from 63m
31m at 1298ppm TREO
STRC018
from 34m
16m at 953ppm TREO
See Schematic
Cross Section
10,400mN
STRC023: From 58m
9m at 1664ppm TREO
STRC024: From 53m
4m at 892ppm TREO
STRC025
From 27m
3m at 1163ppm TREO
SUMMIT
SMMINERALS
LTD
517,000 ME
E 28/3241
E 28/2999
518,000 ME
Perth
6,659,000 mN-
Project
Location
6,658,000 mN-
6,657,000 mN-
SM
SUMMIT
MINERALS
Stallion REE PROJECT
500
metre
LEGEND
Summit Tenement
Phase 1 Drill Holes
Phase 2 Drill Holes