Future Plan for Infrastructure Development in Yumeshima
Infrastructure development map
Sewerage Treatment
Facility
Reclamation and Land
filling (IR)
Peripheral road
for Tourism
Additional
30ha
Reclamation and
Land filling (World
Expo)
⑧Yumeshima Trunk
road (Including improvement
of surrounding )
10 Konohana Bridge
Water supply Facility
Maishima Trunk road
1 Yumemai Bridge
Infrastructure development outline process (plan)
item
2018
2019 2020 2021 2022 2023 2024 2025 2026 2027 2028
④Elevated
road
2
1 Reclamation and Land filling (World Expo)
Reclamation and Land filling (IR)
(3)
Peripheral road for tourism
(Road section)
4 Elevated road
Design
etc
(Bridge section)
Construction
5
Sewerage (drainage etc)
6
Water supply (pump etc)
⑦Railway (South
Railway
route)
(South
route)
8
(9)
[preliminary survey]
[Tunnel structure etc]
[Track, station building, facilities]
Yumeshima Main road
Maishima Main road
10
Konohana Bridge (6 lanes)
11
Yumemai Bridge (6 lanes)
19View entire presentation