Investor Presentaiton
Permian Basin Processing Expanding to Meet Growing Demand
Culberson
Permian Basin plant inlet volumes remain at or near record highs
Gaines
Dawson
Borden
Eddy
Lea
Martin
Howard
Andrews
Bear
Processing Plant (In
Permian Basin Footprint
ՈՐ
ENERGY
TRANSFER
➤ Extensive Permian Basin Footprint:
•
Have significant acreage dedications to ET processing plants in the
Permian Basin
➤ Permian Bridge Pipeline
•
Converted ~55 miles of existing 24-inch NGL pipeline to rich-gas service to
allow 200 thousand MCF/d of rich-gas to move out of the Midland Basin
to the Delaware Basin
Phase I was placed in service in October 2021 and an expansion was
placed into service in Q1 2022
Heavily utilizing to provide operational flexibility between processing
facilities in the Delaware and Midland Basins
➤ Grey Wolf and Bear Processing Plants
Ector
Midland
Glasscock
Loving
•
Grey Wolf
Winkler
Progress)
Processing Plant
Reeves
N
Gas Gathering
A
Pipeline
NGL Pipeline
Other Natural Gas
Pipelines
0
5
10
15
20
Ward
Pecos
Crane
•
•
200 MMcf/d cryogenic processing plants
Grey Wolf plant placed in service in December 2022; Bear plant expected
in service in Q2 2023
Reagan
•
Upton
Due to significant producer demand, evaluating the necessity and timing of
adding another processing plant in the Permian Basin
Crockett
•
The volumes from the tailgate of these plants will utilize Energy Transfer
gas and NGL pipelines for takeaway from the basin
14View entire presentation