ANNUAL REPORT 2018-2019 8 ANNUAL REPORT 2018-2019 KPCL 110 MW Barge Mounted Plant (KPCL-I) (Asset held for sale) 1st Extended PPA Contract: The 1st extended 5 years term PPA with Bangladesh Power Development Board (BPDB) expired on 12 October 2018. However, the extension of KPCL 20 year's old plant is under discussion. Generating Plant: 19 X Wärtsilä 18V32 DG Sets Location: Goalpara, Khalishpur, Khulna Capacity: 110 MW Barge mounted power plant Description of Barges: Two floating barges named Tiger I and Tiger - III. Nine generating units are mounted on one barge and ten on the other. The barges shipped as deck cargo on submersible dry tow ship, are moored in a closed basin. Each barge is approximately 91 metres long and 24 metres wide. Fuel used: Runs on Heavy Fuel Oil (HFO), however, having duel fired capability and can be converted into natural gas operation. Project Cost: USD 96.07 million 9