Investor Presentaiton
GMR Energy Ltd. : Diversified Portfolio of Projects
GAR
Project
Fuel
Ownership
Capacity
Project Cost
Warora
(Maharashtra)
Coal
100%
600 MW
INR 42.5 bn
COD
Power Off-take
September 2013
Fully contracted through long
term PPA
•
Kamalanga
(Orissa)
Vemagiri
(Andhra Pradesh)
Coal
Gas
87.4%
1,050 MW
*
INR 65 bn
March 2014
85% of power contracted
through long term PPA
100%
388 MW
INR 11.5 bn
September 2006
• 100% regulated tariff
• 23 years PPA with Andhra
Pradesh & Telangana
Bajoli Holi
(Himachal Pradesh)
Hydro
100%^
180 MW
INR 22 bn
Expected in 2019
• ~50% of saleable power
contracted through long term
PPA
Fuel Linkage
• Confirmed linkage from Coal
India Ltd. for entire capacity
• Confirmed linkage from Coal
India Ltd. for 85% contracted
capacity
Gas not available since FY13
• Plant operated under eRLNG
scheme during FY16 & FY17
• Run of the river facility
• 71% in FY18
Operated till FY12
• 61% in FY18
PLF
·
⚫74% in FY19
⚫73% in FY19
Operated in FY17 under
eRLNG scheme
•
Others
· Refinancing of project loan
completed
Refinancing of project loan
completed
• Debt-free plant
• Under construction with ~83%
completed by Mar'19
Excludes 350MW of Unit 4 which is yet to be developed
^ Includes both direct & indirect holding
Humility | Entrepreneurship I Teamwork and Relationships | Deliver the Promise I Learning and Inner Excellence I Social Responsibility I Respect for Individual