Investor Presentaiton slide image

Investor Presentaiton

Expedite Infrastructure Construction to Effectively Undertake "East-to-West Computing Resource Transfer" Project Advanced deployment of computing power capability ④ 中国电信 CHINA TELECOM Computing power ⚫3.1 EFLOPS, 41.0 EFLOPS IDC DCI • >700 IDC sites, 487k cabinets, 419k cabinets; utilisatoin rate 72% . Expedite capability development of new hubs: land acquisition and new site construction in Jiangsu, Shanghai, Zhejiang, Anhui, Sichuan, Gansu, etc. • 1H2022 revenue: RMB17.9Bil, 411.1%, revenue scale PRC No. 1 • Strengthened assurance for all-fibre network with 320k km artery of multi-channel optical cable network covering 4 regions + 6 axles +8 hubs • Built industry-leading DCI network: CN2-DCI and OTN for gov't & enterprises connecting 8 major hub nodes and IDCs in major cities nationwide with backbone bandwidth >300Tbps • Inter-hub access latency among 8 major regional hubs *1ms to 15ms . Greenness • Newly-built datacentres PUE<1.3; southern hub PUE<1.25, northern hub PUE<1.2 Commenced energy-saving upgrade of >130 obsolete facility rooms and further propelled obsolete facility retirement Active participation of market-based green electricity trade and expedite introduction of green electricity Note: Increments of infrastructure are vs 2021.12 Hub node ORP Security capability Network security Data security 対 香り 呼伦気鑒 Pl Datacentre Terminal security 9 ONER [春] AM e-Surfing Cloud Server C ***Inner Mongolia Hub Beijing-Tianjin- Hebei Hub Cabinet Datacentre DCI network CN2-DCI Network OTN 6540 Ningxia Hub Gansu Hub R Chengdu Chongqing Hub "Guizhou Hub T Optical cable Yangtze River Delta Hub ALRIC 东 1360 404 Guangdong-Hong Kong- Macau Hub 群島 As 南海诸岛 2022 Interim Results | 27
View entire presentation