Emerging Gold Producer with Massive Exploration Upside
Global Resources
TSXV:PGDC
Company
Project Ownership Cut-Off |Category | Tonnes
100% Basis
Attributable
Grade
Contained Metals
Contained Metals
g/t AuEq
000s
g/t Au
g/t Ag
g/t AuEq 000 oz Au
000 oz Ag 000 oz AuEq
000 oz Au
000 oz Ag
000 oz AuEq
Calcatreu1
100%
0.50
Indicated 9,841
2.11
19.8
2.36
669
6,275
746
669
6,275
746
Inferred 8,078
1.34
13.1
1.50
348
3,399
390
348
3,399
390
Cap-Oeste²
95%
0.50
Indicated 10,558
2.07
63.2
2.99
704
21,453
1,013
669
20,380
962
Inferred 4,895
1.37 34.7
1.87
215
5,467
294
204
5,194
279
La Manchuria³
95%
0.55
Indicated 474
2.59
129.2
3.53
40
1,969
54
38
1,871
51
Inferred
1,836
1.30
40.2
1.56
77
2,375
92
73
2,256
88
La Josefina4
81%
0.20
M&I
6,525
0.74
13.1
0.94
156
2,757
197
126
2,233
160
Inferred
452
0.45
1.2
0.46
7
18
7
5
14
5
Combined
M&I
Inferred
27,398
15,261
1.78
1.32
36.8
22.9
2.28
1.60
1,569
646
32,454
11,259
2,010
1,502
30,759
1,919
783
630
10,863
763
1. Resource estimate prepared by Cube Consulting Pty Ltd. in a technical report with an effective date of December 31, 2018. Resource estimate shown is based on a cut-off grade of 0.5 g/t AuEq (using a
US$1,300/oz gold price and US$16/oz silver price) AuEq values calculated using an 81.25 silver:gold ratio
2. Resource estimate prepared by Cube Consulting Pty Ltd. in a technical report with an effective date of December 31, 2018. Resource estimate shown is based on a cut-off grade of 0.5 g/t AuEq (using a
US$1,100/oz gold price and US$16/oz silver price) AuEq values calculated using a 69.4:1 silver:gold ratio
3. Resource estimate prepared by Mican International in a technical report dated September 27, 2019. Resource estimate shown is based on a cut-off grade of 0.55 g/t AuEq using a gold price of
US$1,300/oz, silver price of US$18/oz and assumed recoveries of 95% Au and 60% Ag. AuEq values calculated using a 72.2:1 silver:gold ratio
4. Resource estimate prepared by UAKO Consultora Geológica in a technical report dated September 9, 2010. Resource estimate shown is based on a cut-off grade of 0.2 g/t AuEq. AuEq values calculated
using a 66.7:1 silver:gold ratio
patagoniagold.com
19
&
PATAGONIA
GOLDView entire presentation