Capex
$2,011m
$1,596m
($2019-20)
INFRASTRUCTURE FOR THE FUTURE
SAPN 2020-25 FINAL REGULATORY DETERMINATION
The AER Final Determination establishes revenue certainty until 30 June 2025
2015-20
Allowance (1) Draft Decision (2)
2020-25
2020-25
2020-25
Revised
Final Decision (2)
Proposal (2)
$1,247m
$1,693m
The Final Determination is in line with expectations with
improved capex and inflation outcomes
Standard Control Services Revenue ($m) and RAB ($bn)(1)(2)
$1,000
Opex
$1,375m
$1,473m(3)
$1,470m
$1,470m
($2019-20)
$800
WACC
6.17%
4.95%
4.79%
4.75%
$600
4.77
4.85
Risk-free
2.96%
1.32%
0.96%
0.90%
4.48
4.59
4.68
4.36
Rate
4.23
$400
4.09
3.88
3.93
Inflation
2.50%
2.45%
2.36%
2.27%(4)
$200
Gamma
Revenue
(Nominal)
0.4
0.585
0.585
0.585
$-
FY16 FY17 FY18
FY19 FY20 FY21 FY22 FY23 FY24 FY25
Revenue Allowance
Draft Determination
Revised Proposal
Final Determination
$3,769m
$3,905m
$3,933m
$3,914m
Regulated Asset Base
The majority of SA Power Networks' Revised Proposal was accepted by the AER in the Final Determination released on 5 June 2020
(1) AER Final Decision 2015-2020, October 2015 updated to $2020 (2) AER Final Decision Overview, June 2020. (3) AER Draft Decision Overview, October 2019. (4) The reduction in the inflation forecast was due to the using of