Investor Presentaiton slide image

Investor Presentaiton

Adani Power (Mundra) Limited Project Overview Capacity (MW) Technology Location State Status COD - 4,620 MW (5 units of 660 MW and 4 units of 330 MW) Super Critical - Mundra Taluka, Kutch District / Gujarat Operational Phase 1 Unit 1 (4-Aug-09), Unit 2 (20-Mar-10) Phase 2 Unit 3 (4-Aug-10), Unit 4 (21-Dec-10) Phase 3 Unit 5 (1-Mar-11), Unit 6 (3-Feb-12) Phase 4 May-12) INR 23,762 cr Unit 7 (9-Nov-11), Unit 8 (5-Mar-12), Unit 9 (11- Location 48 Beraja Vaanki ais Chandroda ચંદ્રોડા બેરજા Koday Bidada કોય Samagoga Bhadreshwar ભદ્રેશ્વર બીદડા 41 સામાગોગા 6 41 Mandvi Hisal Adani Power Mundra Limited. (6) Gulf of Kutch adani Power Project Cost Equipment Boiler Make/Type PPA Babcock & Wilcox Beijing Co. Ltd. (Unit 1 - 4) Harbine Boiler Co. (Unit 5 - 9) Beijing Beizhong Steam Turbine Generator Co. (Unit 1 TG Set Make 4) Fuel Arrangement Coal Transportation Water Linkage Evacuation Arrangement Dongfang Turbine Co. (Unit 5 - 9) 1,200 MW Gujarat, 1,424 MW - HPPC, 90 MW - Others FSA with MCL, SECL - 6.41 MTPA (used by APML / APRL under IPT) Imported Coal - 16.4 MTPA @ 75% PLF Marine to Mundra Port, conveyer belt to plant 3 RO Plants (7 MLD, 20 MLD and 20 MLD) for conversion of sea water to RO water - HVDC Line 1,992 km, 500 KV DC for Haryana Various lines for Gujarat Plant is located in Mundra taluka, Kachchh District of Gujarat and is - 61 km south of Bhuj - Plant is near National Highway 8A Nearest Railway station is Gandhidham located 50 km away IPT - Inter Plant Transfer mechanism (FSA provision allowing transfer of coal between power plants either wholly owned by the user or by its 100% subsidiaries) 45
View entire presentation