Investor Presentaiton
Adani Power (Mundra) Limited
Project Overview
Capacity (MW)
Technology
Location State
Status
COD
-
4,620 MW (5 units of 660 MW and 4 units of 330 MW)
Super Critical
-
Mundra Taluka, Kutch District / Gujarat
Operational
Phase 1 Unit 1 (4-Aug-09), Unit 2 (20-Mar-10)
Phase 2 Unit 3 (4-Aug-10), Unit 4 (21-Dec-10)
Phase 3 Unit 5 (1-Mar-11), Unit 6 (3-Feb-12)
Phase 4
May-12)
INR 23,762 cr
Unit 7 (9-Nov-11), Unit 8 (5-Mar-12), Unit 9 (11-
Location
48
Beraja
Vaanki
ais
Chandroda
ચંદ્રોડા
બેરજા
Koday Bidada
કોય
Samagoga
Bhadreshwar
ભદ્રેશ્વર
બીદડા
41 સામાગોગા
6
41
Mandvi
Hisal
Adani Power
Mundra Limited.
(6)
Gulf of Kutch
adani
Power
Project Cost
Equipment
Boiler Make/Type
PPA
Babcock & Wilcox Beijing Co. Ltd. (Unit 1 - 4)
Harbine Boiler Co. (Unit 5 - 9)
Beijing Beizhong Steam Turbine Generator Co. (Unit 1
TG Set Make
4)
Fuel Arrangement
Coal Transportation
Water Linkage
Evacuation
Arrangement
Dongfang Turbine Co. (Unit 5 - 9)
1,200 MW Gujarat, 1,424 MW - HPPC, 90 MW - Others
FSA with MCL, SECL - 6.41 MTPA (used by APML / APRL
under IPT)
Imported Coal - 16.4 MTPA @ 75% PLF
Marine to Mundra Port, conveyer belt to plant
3 RO Plants (7 MLD, 20 MLD and 20 MLD) for conversion
of sea water to RO water
-
HVDC Line 1,992 km, 500 KV DC for Haryana
Various lines for Gujarat
Plant is located in Mundra taluka, Kachchh District of Gujarat and is
- 61 km south of Bhuj
- Plant is near National Highway 8A
Nearest Railway station is Gandhidham located 50 km away
IPT - Inter Plant Transfer mechanism (FSA provision allowing transfer of coal between power plants either wholly owned by the user or by its 100% subsidiaries)
45View entire presentation