Investor Presentaiton
Overfulfillment of power generation and power consumption targets
Record high in power generation
The four cascade stations, namely Three Gorges, Gezhouba, Xiluodu and Xiangjiaba, had a t
otal annual generation capacity of 226,930 GWh, hitting a new high. The annual generation
capacity of Three Gorges Hydropower Station reached 111,802 GWh, refreshing the world r
ecord for the annual generation capacity of a single hydropower station created by Itaipu Bin
acional in 2016
The cascade stations have stood the test of "long-term, large-load and uninterrupted" operati
on in the main flood season, and the full load generation duration of Xiluodu, Xiangjiaba an
d Three Gorges Hydropower Stations has reached a new high.
Significant marketing results
The task of power consumption was successfully completed in 2020. The fe
ed-in tariff of the Company has remained relatively stable in the past five ye
ars.
The Company has followed the pace of power system reform, improved
marketing ability, established power sales companies, and explored and
optimized marketing system and mechanism
Feed-in Tariff of the Company in 2016-2020
Planned Generation Capacity/ Actual Generation Capacity of
Hydropower Stations in 2020 and 2019
634 615 608
331 330 337
1118
970 969
276.80
(100 GWh)
Actual
generation
Planned
276.78
276.86
(RMB/MWh)
270.05
264.90
186 185 191
generation
Generation in
2019
2016
2017
2018
2019
2020
Xiluodu
Xiangjiaba
Three Gorges
Gezhouba
Record high in work safety forms
"Promoting Safety by Science
and Technology"
Online operation of the
safety management
"Green Production"
Take action to implement
"overall protection of Yangtze
River"
11th Year
3rd Year
Zero casualties and zero
Zero minor injuries
equipment accidents
长江电力
China Yangtze Power Co., Ltd.
Source: periodic reports and other publicly disclosed information of the Company
information platform