Eos Energy Investor Presentation Deck
Building Commercial Momentum
How Does Eos Compete?
IRR measures total project value across multiple performance parameters
17
System Sizing
Operating Costs
ITC
4-hour
discharge
-0.7%
-1.0%
+2.0%
+0.2%
+2.5%
+0.3%
+2.0%
eos.
+5%
Capital Costs
RTE
Auxiliary
Power
Operational
Flexibility
Degradation
Service osts
Made in
America
8-hour
discharge
-0.5%
-0.9%
+3.0%
+0.4%
+3.5%
+0.5%
+3.5%
●
+9%
●
●
Total IRR
Delta*
*All calculations are after tax, unlevered and derived on a 20-year project monetizing capacity and energy arbitrage
●
Why it Matters?
Higher EPC costs driven by larger footprint (civil works)
RTE improves with longer duration discharge
90% lower than other technologies
Dispatch flexibility to capture multiple revenue streams
Low degradation and no system repowering
No HVAC & fire system service
Capturing IRA domestic content benefit
eos.View entire presentation