Massive Sulphide Project Overview
EXTENSION ZONE - HIGHLIGHTS OF 2019 DRILLING
Selected Results
62 holes (over 14,000 metres) have been completed to-date on the Massive Sulphide Project. Drilling in 2019
was completed from 14 pads along a strike length of 760 metres (or approximately 30% of the strike length)
within the Main Zone.
Length
Hole
Pad
(m)
True
Width (m)
Silver
Lead
Zinc
Copper
Manganese
(g/t)
(%)
(%)
(%)
(%)
YKDD19-040
5
26.5
16.32
153.57
3.10
2.44
0.42
4.09
YKDD19-042
5
28.3
14.15
113.96
9.34
12.37
0.09
3.05
Including
1.0
0.50
134.00
56.59
0.40
0.03
4.32
And
4.0
2.00
150.50
7.39
36.96
0.05
2.53
And
3.0
1.50
213.33
10.73
41.43
0.10
1.41
YKDD19-043
5
22.6
8.47
48.20
8.20
4.90
0.04
3.20
Including
3.0
1.12
55.33
21.91
1.48
0.01
4.07
And
1.1
0.41
235.40
49.30
3.72
0.11
1.99
And
3.1
1.16
97.47
6.87
21.23
0.05
3.02
*See
press
release dated September 5, 2019
CANTEX
TSXV: CD
RESULTS FOR 2,648
METRES WERE
RELEASED WITH THE
DEEPEST SULPHIDE
INTERSECTION TO
DATE AT 335
VERTICAL METRES
BELOW SURFACE
22
22View entire presentation