Massive Sulphide Project Overview slide image

Massive Sulphide Project Overview

EXTENSION ZONE - HIGHLIGHTS OF 2019 DRILLING Selected Results 62 holes (over 14,000 metres) have been completed to-date on the Massive Sulphide Project. Drilling in 2019 was completed from 14 pads along a strike length of 760 metres (or approximately 30% of the strike length) within the Main Zone. Length Hole Pad (m) True Width (m) Silver Lead Zinc Copper Manganese (g/t) (%) (%) (%) (%) YKDD19-040 5 26.5 16.32 153.57 3.10 2.44 0.42 4.09 YKDD19-042 5 28.3 14.15 113.96 9.34 12.37 0.09 3.05 Including 1.0 0.50 134.00 56.59 0.40 0.03 4.32 And 4.0 2.00 150.50 7.39 36.96 0.05 2.53 And 3.0 1.50 213.33 10.73 41.43 0.10 1.41 YKDD19-043 5 22.6 8.47 48.20 8.20 4.90 0.04 3.20 Including 3.0 1.12 55.33 21.91 1.48 0.01 4.07 And 1.1 0.41 235.40 49.30 3.72 0.11 1.99 And 3.1 1.16 97.47 6.87 21.23 0.05 3.02 *See press release dated September 5, 2019 CANTEX TSXV: CD RESULTS FOR 2,648 METRES WERE RELEASED WITH THE DEEPEST SULPHIDE INTERSECTION TO DATE AT 335 VERTICAL METRES BELOW SURFACE 22 22
View entire presentation