Investor Presentaiton
Innovative technologies in development & roll-out
Coarse Particle Recovery
Flotation process changed
An enabler for hydraulic dry stacking
Allows material to be crushed to larger particle size:
⚫Throughput increase: +15% to 20%
• 20% energy reduction per tonne¹
•
Up to 85% water recovery with hydraulic dry stack
Capital cost $10m to $150m
El Soldado (Copper)
• Demo plant construction &
commissioning completed in 2021
• Further testing in progress
particle recovery unit
Mogalakwena North (PGMs)
•
Constructing full scale system
• 100% of volume
Quellaveco (Copper)
Commissioning expected late 2023
• Treatment of tailings
• Start up anticipated Q4 2022
•
Recoveries c. +3% over LOM
Next planned rollouts
Feasibility work continues at Los
Bronces (Copper) & Minas-Rio (Iron
Ore)
• Collahuasi - investigating options
1. Total energy consumed remains the same, but CPR allows the throughput to increase, hence our energy efficiency improves, and energy consumed per tonne treated reduces.