Investor Presentaiton slide image

Investor Presentaiton

Future Energy Park - Largest Expected Carbon Negative Project in North America ~$1.2 billion capital investment in Alberta Net CO2 negative biofuels facility using non-food grade wheat¹ to produce RNG and bioethanol. Approvals Received: Land Use Approval; Water Act Approval from Alberta Environment and Protected Areas; Environmental Protection and Enhancement Act ("EPEA") Approval from the Government of Alberta's Ministry of Environment and Protected Areas Finalizing engineering, procurement, and construction ("EPC"), offtake and supply contracts Construction anticipated to start in 2024 Plant site located on ~50 acres within City of Calgary on industrial lands; adjacent to existing utilities and infrastructure 16 grain terminals with capacity of 380,000 tonnes and a transloading facility are located within a 100 km radius Additional project information is available at https://www.greenipi.com/portfolio/future-energy-park/ [email protected] TSXV: GIP Expected Financial Profile³ Cost ($mm) Offtake Credit Rating (Offtake) Feedstock Expected Completion Date Confirmed A-/BB Sourced 2026 -$1,200 RNG Sales (Annual) Carbon Offset Credits Cellulosic Equivalent Ethanol Proforma EBITDA² >3.5 Million MMBtu $100 million Up to 1.5 million tonnes $125 million >300 million L $110 million High-Quality Protein Distillers' Grain ~350,000 tonnes 1. Assumes 800,000 tonnes of non-food grade wheat purchased annually $20 million Total Expected EBITDA ($mm)² >$300 2. The Q3 2023 MD&A provides additional disclosure on the expected EBITDA of Future Energy Park. Please see non-GAAP measures on page 3 3. Subject to the close of both debt and equity financing All figures on this page are in Canadian dollars (C$). Green Impact Partners 10
View entire presentation