Investor Presentaiton slide image

Investor Presentaiton

NHPC - Operational Projects with Subsidiary एनएचपीसी NHPC Installed Design S. Project No Capacity Energy (MW) (MU) Year of Comm. Completion Cost Tariff 2013-14 (Rs./kwh) Type of the project Projects Completed with Subsidiary 1 Indrasagar, (8x125) 1000 1846.19 2005 4520.18 3.00 Storage Madhya Pradesh 2 Omkareshwar, 520 865.05 2007 3015.40 4.80 Storage (8x65) Madhya Pradesh Total-B 1520 2711.24 7535.58 Grand Total(A+B) 6507
View entire presentation