TAQA H1 2021 Results - Energy Transition and Financial Performance slide image

TAQA H1 2021 Results - Energy Transition and Financial Performance

r TAQA at a glance (2) Our Abu Dhabi and UAE home markets Transmission (Transco) 100% TAQA ~14k km power and water networks Distribution (ADDC & AADC) 100% TAQA ~89k km power and water networks ~1 million end-user connections Shuweihat S1 60% TAQA 1,615 MW/101 MIGD Gas/MSF; 4 years Shuweihat S2 60% TAQA 1,627 MW/101 MIGD Gas/MSF; 16 years Shuweihat S3 60% TAQA Interconnection to Saudi Arabia (GCCIA) Al Mirfa (MIPCO) Sweihan PV 60% TAQA 1,177 MW (DC) Solar PV; 24 years Umm al Naar 60% TAQA 2,290 MW/96 MIGD Gas/MSF; 7 years 1,647 MW Gas; 19 years 60% TAQA 1,665 MW/53 MIGD Gas/MSF, RO; 22 years Abu Dhabi Ras al Khaimah Umm Al Quwain Ajman Sharjah Dubai Fujeirah F1 60% TAQA 882 MW/131 MIGD Gas / MSF, RO; 15 years Fujeirah F2 60% TAQA 2,114 MW/ 132 MIGD Gas/MED, RO; 10 years Fujeirah F3 I (under construction) | 40% TAQA, 20% Mubadala 2,400 MW Gas; 25 years (from PCOD, expected 2023) Al Ain Interconnection to Oman (GCCIA) Power (thermal) Power (renewable) Power and Water (cogeneration) Water Plant name TAQA and GRE ownership Power/water (installed capacity^) Fuel/ desalination technologies (as applicable) (P)(W)PA residual life (as at 31/12/2020) Development projects Transmission and Distribution Asset name TAQA ownership Transmission or distribution networks Other details Al Dhafra PV\ (under construction) | 40% TAQA, 20% Masdar I 2,000 MWdc (1,500 MWac) | I Solar PV; 30 years (from PCOD I expected 2022), Taweelah A1 60% TAQA 1,671 MW/84 MIGD Gas / MSF, MED; 8 years Taweelah A2 60% TAQA 760 MW /53 MIGD Gas/MSF; 1 year Taweelah B 60% TAQA 2,220 MW/162 MIGD Gas/MSF; 8 years V Taweelah RO (under construction) I 20% TAQA, 40% Mubadala 168 MW/ 200 MIGD | Solar PV / RO; 30 years (from PCOD, expected 2022) 18 TQ
View entire presentation