Investor Presentaiton slide image

Investor Presentaiton

Lake Overview LAKE RESOURCES 1 One of Largest Lithium Development Projects Across the Lithium Triangle Advanced and Proven Process to Produce 2 Battery Grade Lithium Carbonate Lake's flagship project - Kachi - is a globally significant, large-scale 10.6 Mt LCE¹ resource supporting 25 ktpa of battery-grade lithium carbonate production Advanced engineering and technical work described in December 2023 DFS11 10.6 Inferred 3.3 Ore Reserves 6.7 Measured & Indicated 0.6 Resource in Million Tonnes LCE ■ Extensive piloting and demo plant delivered consistent results, validated by multiple independent parties Demo plant processed 5.2M liters of brine into 200K 12 liters of concentrate and produced ~1,300 kg of battery grade lithium carbonate (>99.5% purity) in one of the largest known DLE-to-BG carbonate test program Achieved 99.9% impurity rejection, 80% lithium recovery, 93% plant uptime while using 10x less freshwater, 7x less land and generating 55x less waste than evaporation ponds 3 Significant Technical Work Completed To Prove Project Validity and Complete DFS 2017-2021 Environmental Impact Declaration (EID) Initial drilling program Initiated Completion of Preliminary Environmental Assessment Update to EIA Resource drilling and completion of Pre-Feasibility Study (PFS) Results Exploration Extension & Updated Exploration EID ■2022 2023 Pilot Plant Authorization Successful pumping and injection testing9; further drilling to 600m 10, completion of Saltworks Testing Program; proof of technology, progress of process plant design² Hydrogeology Model calibration completed JORC Compliant Mineral Resource Reports 2,3,4,5,6 Power solution, completion of technical feasibility, qualifying FEED contractors and tendering progressed Demonstration plant campaign successfully completed - produced >1,300kg of battery grade lithium carbonate Definitive Feasibility Study (DFS) Report Completed (with AACE7 Class 3 estimate (+/-15%)) 1 Refer to ASX announcement dated 22 November 2023. 2 Refer to ASX announcement dated 26 September 2023. 3 Refer to ASX announcement dated 15 June 2023.4 Refer to ASX announcement dated 16 August 2023. 5 Refer to ASX announcement dated 4 October 2023.6 Refer to ASX announcement dated 12 February 2024. 7Association for the Advancement of Cost Engineering. 8 See ASX announcement dated 19 December 2023.9 Refer to ASX announcement dated 15 August 2023. 10 Refer to ASX announcement dated 22 August 2023. 11 See the Company's JORC technical report dated effective December 19, 2023, "Kachi Lithium Brine Definitive Feasibility Study" for full details regarding material assumptions relied upon. Lake confirms the material assumptions in that announcement continue to apply and have not materially changed. 12 200K+ litres of concentrate processed but only 120K was used to produce battery grade lithium carbonate. The excess remain in storage. 10
View entire presentation