Battery Storage (BESS) and Hydro Pump Storage (HPSP) Capacity Mix for FY 2031-32 National Electricity Plan 2023 Base Case Energy Storage Capacity Total Generation (Inc. HPSP) Capacity Projection JSW Energy Corporate Presentation - Jan 24 PSP JSW Energy Upper Reservoir Control Room Power Intake Tunnel Discharge Tunnel 27 GW X 6 hours = 160 GWh Lower Reservoir BESS* 47.2 GW X 5 hours = 236 GWh 874 GW (FY 2031-32) Considering base capacity as capacity mix for 2021-22 JSW Energy 40GWh/5GW of energy storage capacity by FY 2030 3.4GWH of storage locked in (1GWh of BESS and 2.4 GWh of HPSP) Large Resources secured for ~80 GWh PSP Growth through internal accrual Existing portfolio generating healthy CF & mid-teen equity IRR 29