Investor Presentaiton slide image

Investor Presentaiton

Highlights of Recent Drilling: LEGEND 12 Proposed Drill Program Veins 3D Wireframe Underground Workings 500 Underground Proposed PG-20-K to PG-20-P Underground Proposed PG-20-H to PG-20-J 200 300 Meters Don Ricardo Target Underground Proposed PG-20-E to PG-20-G Surface Proposed PG-20-D A Guanajuato Silver Drill Hole From To Interval (m) Au gpt Ag gpt AgEq gpt P21-03 97.95 102.00 4.05m 0.68 62 116 99.15 100.15 1.00m 1.50 122 242 106.80 107.35 0.55m 2.11 505 674 P21-07 2.40 2.90 0.50m 0.35 83 111 2.90 4.15 1.25m assays pending 4.15 4.60 0.45m 0.32 66 92 P21-08 102.25 103.90 1.65m 2.45 125 321 158.60 159.10 0.50m 0.21 48 65 169.20 171.25 2.05m 3.79 100 403 including 169.70 170.45 0.75m 8.81 208 913 174.60 175.60 1.00m 0.93 41 115 176.15 177.15 1.00m 1.65 45 177
View entire presentation