Investor Presentaiton
Target 3 & 4 - Kobada North 1 & 2
Untested section of mineralized structure
Kobada North 1 and 2 targets lie directly on the Kobada Shear
and cover 2.3km of strike north from the Kobada Main deposit
•
Limited drill testing at Kobada North 1
•
No previous drill testing at Kobada North 2
•
Extensive artisanal workings
Initial results released in March and April 2023 extended strike
at Kobada North by over 2km
•
Key intercepts include:
9m at 1.32 g/t and 14m at 1.02 g/t (KN1)
•
1m at 7.86 g/t (KN1)
•
1m at 8.51 g/t (KN2)
• 1m at 0.64 g/t (KN2)
Note: Refer to the Company's announcement dated 8 March 2023 and 11 April 2023.
547000mE
о
Historical Drilling
2023 Drilling
Resource outline
1295000mN
548000mE
1m @ 0.64 g/t Au
Kobada North 2
TOUBANI
RESOURCES
549000mE
KN2/22 P008-010
KN2/22 P001-003
1m @ 8.51 g/t Au
1294000mN
Kobada West
9m @1.32 g/t Au
Kobada North 1
00
°
KN22_P007
1m @ 6.09 g/t Au
0 0 0
0 000
KN22_P012
1m @ 24.8 g/t Au
KN22_P012
3m @ 1.21 g/t Au
1293000mN
17
11
2.1km
OPEN
KN1/22 P009
KN1/22 P008
00 KN1/22 P007
KN1/22 P005
8PPO KN1/22_P004
650m
14m @ 1.02 g/t Au
1m @ 1.52 g/t Au
1m @7.86 g/t Au
76
3
KN22 P003
1m @ 9.62 g/t Au
2m @ 3.38 g/t Au
KN22 P026
[email protected] g/t Au
KN22_P025
1m @ 1.35 g/t Au
400m
29
25
00000
600m
10
oooo
000000
22
0 0 с
0
Kobada North
5km
1000m
25View entire presentation