KEY COST PARAMETERS
PARAMETER
LAND RENT IN SEZ
LAND VALUE IN SEZ
PARAMETER
GAS SUPPLY
ELECTRICAL POWER SUPPLY
DRINKING WATER
SEWAGE
*Combined rate for January-September 2022 for the management company.
**The established cost of the tariff from 01.07.2022-31.12.2022.
SEZ AREA FOR RESIDENTS' CONSTRUCTION
411,75 H
HA
TOTAL PROJECT
CAPACITY IN SEZ
TARIFF
RENTAL VALUE DEPENDS FROM
LAND COST
THE CADASTRAL VALUE OF LAND
PLOT AND THE AMOUNT OF INVESTMENT.
THE MINIMUM LAND RENT:
FROM
1,47 RU
RUB. FOR 1 SQ.M/14 675,00 FOR 1 HA
THE MINIMUM LAND VALUE:
FROM
7,34
RUB. FOR 1 SQ.M/ 73 375,00 FOR 1 HA
ENERGY SUPPLIER
**
5,71 RUB./M³
13,13*** RUB./M²
LLC <<GAZPROM MEZHREGIONGAZ
SAMARA>>
PJSC <<SAMARAENERGO>>
LLC <<SAMESK>>
LLC <<AVTOGRAD VODOKANAL>>
7,893 RUB./M
250 000 M²/hour
180 MW
4,25* RUB./KW
7 300 M³/day
7 300 M²/day
PRESENTED TARIFFS ARE INDICATIVE AND UNOFFICIAL
The values are indicated without VAT applicable within the territory of Togliatti city
Tariffs to be checked on websites of energy companies:
SAMARAREGIONGAZ.RU SAMARAENERGO.RU AVKVODA.RU
↑ 1² 1 HA = 10 000 M²