Investor Presentaiton slide image

Investor Presentaiton

Lihir - Indicative mine plan 1,2,3,4,5 Timing (Years) Sources Total Material Moved (Mt)³ Waste (Mt) Tonnes to Stockpiles (Mt) Ex-pit Tonnes Fed (Mt) Stockpile Tonnes Fed (Mt) Plant Feed (Mt)4 Average Feed Grade g/t Minifie & Lienetz, medium grade FY20-24 350-360 145-155 50-55 20-25 50-55 70-80 -2.6 stockpiles, and pre-strip Lienetz & Kapit, medium/low grade FY25-29 325-335 150-160 15-20 30-35 40-45 70-80 -2.6 stockpiles and pre-strip FY30-34 Lienetz & Kapit and low grade stockpiles 270-280 95-105 20-25 70-75 0-5 70-80 ~2.5 FY35-39 Kapit and low grade stockpiles 140-150 30-40 0-5 20-25 55-60 70-80 ~1.7 FY40-44 Low grade stockpiles 10-15 10-15 10-15 ~1.5 FY45+ Remaining Ore Reserves if any, subject to ongoing study 1 234 5 As at 15 August 2019. Indicative only and should not be construed as guidance. Subject to market and operating conditions, regulatory and landowner approvals and further study. See slide 32 for details as to the Ore Reserves that underpin the indicative mine plan subject to depletions for the period from 1 January 2019 Includes sheeting material and crusher rehandle. Plant feed = Ex-pit + Stockpile feed Based on the Company's knowledge and good faith assumptions as at the date of release of this presentation. The indicative mine plan will be updated on an annual basis, or sooner if there are significant changes in the underlying assumptions Indicative estimates are provided on a Base Case basis. Further optionality and upside exists in relation to the operation, with there being a number of projects and studies in progress to pursue these 18
View entire presentation