Investor Presentaiton
Low risk,
low cost exploration
SW
NE
Lisbon
Valley fault
Kbc
Kbc15.
Kd13
Kd.
Kd13
Kd
Kbc14
Kbc
kbcis
Kbc15
Jm
Jm
Jm
Pc
IPh
Outcropping Copper Mineralization
Exploration Targets
Inversion Model Resistivity (ohm-m)
225
100
700
700
006
1000
1100
1200
1300
1400
1500
1600
Kd Upper Dakota Fm
Kd13 Lower Dakota Fm
Kbc14 Upper Burro Canyon Fm
Kbc15 Lower Burro Canyon Fm
Jm Morrison Fm
Pc Cutler Fm
IPh Hermosa Group
Road-side
Pipe-line
1700
1800
1900
4234000m
47.360GOWN
1.4% Cu, 11g/t Ag
SAMPLE: 650518
500m
4233000m
582
45
413
307
238
196
2200
164
140
2150
122
107
2100
2050
2000
1950
1900
Elevation (m)
71
63
57
47
41
25
1850
Project Claim Boundary
Completed IP Line
O Planned drill collar
Geochem Sampling
>1% Cu
• >0.46% Cu
1800
• >0.25% Cu
1750
Resistivity
ohm-m
• <0.25% Cu
Copper Warrior schematic geological section (top) and
IP resistivity data along Section 6 (bottom).
NO
Section
10
Utah
COPPER WARRIOR
PROJECT
LISBON VALLEY COPPER MINE 15km
Completed IP lines and sampling locations within
the Copper Warrior Project area.
Section
4234000m
3.3% Cu, 55g/t Ag
SAMPLE: 650486
4232000m
4233000
222
4235000m
METALS FOR THE CLEAN ENERGY FUTUREView entire presentation