CGNI Financial and ESG Update
5 Material wise, we are ready to distribute a 20% blend of hydrogen with NG. Specifically,
pipeline components are prepared to a large extent for 100% H2 distribution
Current Steel and PE Pipeline Breakdown
6
■Owned LP and MP PE in
km
13 885
28%
■Owned LP and MP Steel
in km
35 368
72%
Source: GasNet; Marcogaz (EU); NREL (USA); GRTGaz (FR); HyDeploy (UK); Hy4Heat (UK); internal analysis.
•
•
•
PE mains are crucial for future distribution of blended gases and
hydrogen
CGNI is well-positioned with its current pipeline material mix
A significant proportion of ~72% of current, owned local
network length are already in PE
60% of municipalities have already a PE pipeline share higher
than 99%
By replacing legacy materials (steel) with modern materials (PE),
the Company also expects to drive emission and cost savings.
gasnet.cz
50View entire presentation