Investor Presentaiton
NHPC - Projects in Operation
एनएचपीसी
NHPC
Tariff
Installed
Design
(ОСТ 14
Year of Completion
S.No
NHPC Project & State
Capacity
Energy
Bill)
Type of the project
comm.
Cost
(MW)
(MU)
(Rs.
/kwh)
1
Baira Siul (3x60)
180
779.28
1981
148.08
1.54
Run of River (ROR) with small
Himachal Pradesh
pondage
2
Loktak, (3*35)
105
448.00
1983
135.68
2.78
Storage
Manipur
3
Salal, (6x115)
690
3082.00
1987
959.16
0.96
ROR
Jammu & Kashmir
4
Tanakpur, (3x40)
120
452.19
1992
379.16
2.30
ROR
Uttarakhand
5
Chamera-1, (3x180)
540
1664.55
1994
2400
2.01
Storage
Himachal Pradesh
6
Uri-1, (4x120)
Jammu
480
2587.38
1997
3300
1.61
ROR
& Kashmir
7
Rangit, (3*20)
60
60
338.61
2000
492.26
2.90
ROR with small pondage
Sikkim
8
Chamera-II, (3*100)
300
1499.89
2004
Himachal Pradesh
RC-1987.03
(Mar-04)
2.74
ROR with small pondage
6
Dhauliganga-1, (4x70)
280
1134.70
2005
1788.07
2.91
ROR with small pondage.
Uttarakhand
10
10
Dulhasti, (3x130)
390
1907.00
2007
5228.49
6.16
ROR with small pondage
Jammu & KashmirView entire presentation