NHPC - Projects in Operation एनएचपीसी NHPC Tariff Installed Design (ОСТ 14 Year of Completion S.No NHPC Project & State Capacity Energy Bill) Type of the project comm. Cost (MW) (MU) (Rs. /kwh) 1 Baira Siul (3x60) 180 779.28 1981 148.08 1.54 Run of River (ROR) with small Himachal Pradesh pondage 2 Loktak, (3*35) 105 448.00 1983 135.68 2.78 Storage Manipur 3 Salal, (6x115) 690 3082.00 1987 959.16 0.96 ROR Jammu & Kashmir 4 Tanakpur, (3x40) 120 452.19 1992 379.16 2.30 ROR Uttarakhand 5 Chamera-1, (3x180) 540 1664.55 1994 2400 2.01 Storage Himachal Pradesh 6 Uri-1, (4x120) Jammu 480 2587.38 1997 3300 1.61 ROR & Kashmir 7 Rangit, (3*20) 60 60 338.61 2000 492.26 2.90 ROR with small pondage Sikkim 8 Chamera-II, (3*100) 300 1499.89 2004 Himachal Pradesh RC-1987.03 (Mar-04) 2.74 ROR with small pondage 6 Dhauliganga-1, (4x70) 280 1134.70 2005 1788.07 2.91 ROR with small pondage. Uttarakhand 10 10 Dulhasti, (3x130) 390 1907.00 2007 5228.49 6.16 ROR with small pondage Jammu & Kashmir